Dock your dreams here
Phone: 864-882-7671
Home Twitter FaceBook YouTube Blog
slideshow


The most common solution is rip rap (graded stone) erosion control. Kroeger Marine has a fleet of barges that will install rip rap from the water. The advantages of applying rip rap by barge to your waterfront include:


• No heavy trucks entering your property or crossing driveways and septic fields; therefore no possible damage to your sidewalks, landscaping or sprinkler system. Your property remains untouched.

• It is off-loaded from the lake to the shore rather than dumped over the bank edge from your land, preventing the loss of material that rolls beyond its intended placement.

• We can transfer debris and spoil matter from your property by barge. We can also assist your contractors with transporting materials in or out by barge.

• We are able to contour and shape the shoreline from the barge. This is essential for a sound rip rap structure and involves the shaping of cantilevered over-hanging banks to form a suitable slope for rip rap.

• Several different rock selections varying in color, size, and shape are available to not only protect but enhance the appearance of your grand lake front entrance

 


Our 25 years of experience protecting many shorelines on Lakes Keowee, Hartwell, allows us to purchase at the best price and select the most unique style stones to protect your property and your budget. To learn more about these stone options, contact us at ___-



We are ready to make lakeside living better. Contact us today at 864.882.7671 or email:
  

2313 Blue Ridge Boulevard, Seneca, SC 29672